1 / 5
Half-cell design brings higher efficiency:
Manufacturing systems are equipped with sophisticated scheduling and dispatching capabilities, automated material handling functionality, and smart devices utilization. All cells and modules must pass through a list of 48 different tests to ensure that the visual, optical, electrical, physical, and mechanical properties meet high standards.
| Method | Trade Terms | Condition |
|---|---|---|
| T/T | EXW / FOB | 30% in advance, balance before dispatch |
| T/T | CIF / CFR | 30% in advance, balance against copy of B/L |
| L/C | Global | Irrevocable L/C at sight (Orders > $50,000) |
| Lead Time | 7 to 10 working days after advanced payment | |